• 0

Project Consultancy, Reports & Profiles

Why should you start your own Business?

As a business owner, you have the freedom to set your own hours. Work half days, sleep in, stay up late, or take a day off - it's up to you. You'll be busy at the beginning of your business, but you will be able to free up more time as you scale and learn to delegate. Now you get to set your schedule. 

When you own your own business, you can work remotely, from home, in a co-working space, an office, or even at the local coffee shop. When you are on the go, you can work anywhere. 

In the case of a fixed salary job, your income is likely to be limited. You'll receive a salary no matter how much you produce or contribute. Starting a business gives you the ability to decide how much money you want to make. That's entirely up to you. The sky's the limit in terms of income when you own your own business. There is always the possibility of earning more and expanding your business.

 

Why should you start a Business in Karnataka?


The Government's Initiatives: 

The state of Karnataka is the first in the country to offer aspiring entrepreneurs in small, medium and major sectors the freedom to begin operations without waiting for approval or permits from the government. 

Karnataka's government approved the Karnataka Industries (Facilitation) (Amendment) Bill, which exempts industries from obtaining permissions from multiple agencies for the first three years. Karnataka has been the first state to implement a long-delayed industrial reform and boost investment in various sectors. Interested investors need to submit a proposal to the Karnataka State High-Level Clearance Committee (SHLCC) to start an enterprise or industry.

 

Friendly Business Climate:

In terms of investments and exports, Karnataka is a leader in India's technology sector. It's also a popular investment location for the auto, electronics, food processing, heavy machinery, and textile industries. 

Being one of the five most industrialized states in India, Karnataka has emerged as an attractive investment destination. Business and residence are ideal in the state because of their available opportunities and subsequent benefits along with the government's investor-friendly policy. 

Karnataka has had notable success in promoting high-tech industries in critical sectors such as telecommunications, electronics, information technology, precision engineering, automobiles, readymade garments, biotechnology, and food processing. Karnataka's strong base of large and medium-sized industries has created a broad scope for the emergence of a flourishing small-scale sector, which provides considerable employment opportunities to the state's people. Investment opportunities in Karnataka are plentiful, both for domestic and foreign investors.  

With 48% of total FDI equity inflows during the FY 2021-22 (through June 2021), Karnataka is the top recipient state. The state ranks 4th in the basket of national exports for merchandise. In 2019-20, the state exported $15 billion worth of goods, 5.2% of India's total exports.

 

Connectivity and Infrastructure for Industrial Development:

With two International Airports, 14 National Highways and 115 State Highways, and a 3,250 km rail network, Karnataka is well connected to all major markets. A coastline of 300 km is located in the state, with ten minor ports. Mangaluru is the state's major port. In addition, the state is situated along the Bengaluru-Mumbai Economic Corridor and the Chennai-Bengaluru Industrial Corridor.

 

The Advantages of Starting a Business in Karnataka

 

 

  • Access to quality power and water, as well as good infrastructure, readily available land. 
  • The only state with ten distinct agro-climatic zones and nine distinct soil types for growing virtually any kind of agriculture and horticulture crop. 
  • The International Flower Auction Board in Bangalore facilitates flower exports. 
  • At Hassan, there is a food processing SEZ. The development of five industrial parks for food processing is underway. 
  • The Karnataka Grape Processing and Wine Policy 2007 promotes the production and marketing of wine and provides a better remuneration to farmers. 
  • A robust technical manpower base, as well as a large number of engineering/technical institutions and centres of excellence. 
  • A technologically savvy workforce with strong English language proficiency. 
  • Optimum climate, cosmopolitan lifestyle, and a conducive environment. 
  • Health care facilities, good connectivity, effective law and order, and cordial industrial relations. 
  • Investor-friendly governance, combined with excellent logistics support and e-governance. 
  • Mineral resources include Pink and pink multi-coloured granite, grey granite, black and green granite, yellow granite, sandstone, moulding sand, iron ore, manganese, soapstone, aluminous laterite, limestone/dolomite, quartzite, etc. 
  • Providing a boost to mineral-based industries through the Karnataka Mineral Policy 2008. 
  • US$ 2.42 billion worth of iron ore and minerals were exported in 2007-2008. 
  • An enormous amount of agricultural and horticulture resources serves as raw material for numerous food processing industries. 
  • Excellent infrastructure network for road, rail, and port connectivity. 
  • A special economic zone exclusively for petroleum and petrochemicals in Mangalore. 
  • Among the states of India, it ranks 4th in popularity for tourism.

 


How to Start a Business in Karnataka


How can you register with the Karnataka Startup Cell?

Visit https://startup.karnataka.gov.in/ and complete the online application. After completing the online application form and uploading all required documents, the Startup Reg Certificate application will be processed.

 

The Documents you need to Upload;

     Certificate of incorporation or registration

    Audited Financial Statements/ Total Revenue generated letter from the CA on the letterhead of the CA, duly signed and sealed (Format provided on the application form)

     Self-Declaration (Format provided with the online application form)

 

Startup Registration Certificates can be obtained within ten working days of submitting your application, as long as you submit all required documents and qualify for registration as per the Karnataka Startup Policy 2015-20. 

These are the steps to register with Karnataka Startup Cell. For various other steps and necessities of starting a business in Karnataka, contact Entrepreneur India or Niir Project Consultancy Services.

 

AD_20Art21

 


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

 

Chocolate is a co... Read More

Capacity :
Milk Chocolate:1,600 Kgs Per Day Dark Chocolate:1,600 Kgs Per Day White Chocolate:1,600 Kgs Per Day
Plant and Machinery cost:
249.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
671.00Lakhs
Add To Inquiry Basket
Set up a Unit of Carbon Black Manufacturing Business
Set up a Unit of Carbon Black Manufacturing Business

 

Under regulated c... Read More

Capacity :
167 MT per day
Plant and Machinery cost:
2563.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
25.00 %
TCI :
0.00 Lakhs
Cost of Project :
8249.00Lakhs
Add To Inquiry Basket
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles

 

Introduct... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry

Introduction:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads

Introduction:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

Chocolate is a general term... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to Manufacture Carbon Black A Profitable Business Idea You Can Start
How to Manufacture Carbon Black A Profitable Business Idea You Can Start

Carbon black is made up of ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Pan Masala Sada, Meetha & Zarda Manufacturing Business Plan
Pan Masala Sada, Meetha & Zarda Manufacturing Business Plan

Pan Masala is a balanced mixture of betel leaf with lime, areca nut, clove, cardamom, mint, tobacco, essence and other... Read More

Capacity :
Sada Pan Masala (10 gms Size each Pouch) : 165 Kgs / Day Meetha Pan Masala (4 gms Size each Pouch):
Plant and Machinery cost:
21.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
64.00Lakhs
Add To Inquiry Basket
Business Plan for Rewinding of Burnt Electric Motors
Business Plan for Rewinding of Burnt Electric Motors

Electric motors are relatively simple mechanical devices, given the sheer number of various motors and winding pattern... Read More

Capacity :
Rewinding Brunt Electric Motors: 10 Nos./ Day
Plant and Machinery cost:
885.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
1320.00Lakhs
Add To Inquiry Basket
Plastic Waste Recycling Plant – Business Plan
Plastic Waste Recycling Plant – Business Plan

 

Waste is now a global problem, and one that must be addressed in order to so... Read More

Capacity :
Recycled PP Granules : 578 Kgs / Day Recycled LDPE Granules: 720 Kgs / Day Recycled HDPE Granules: 7
Plant and Machinery cost:
144.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
380.00Lakhs
Add To Inquiry Basket
Start a Toothpaste Manufacturing Business
Start a Toothpaste Manufacturing Business

Toothpaste may be a paste or gel to be used with a toothbrush to maintain and improve oral health ... Read More

Capacity :
White Toothpaste 50 gms Size: 96,000 Tubes / Day White Toothpaste 240 gms Size: 16,800 Tubes / Day S
Plant and Machinery cost:
308.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
34.00 %
TCI :
0.00 Lakhs
Cost of Project :
6936.00Lakhs
Add To Inquiry Basket
Composite Materials-Carbon Fibre Composites & Glass Fibre Composites
Composite Materials-Carbon Fibre Composites & Glass Fibre Composites

A material is composed of a minimum of two materials, which combine to offer proper... Read More

Capacity :
Carbon Fibre Composite Laminate M2 width 1500 mm : 833.3 Sq. Mt. / Day Glass Fibre Composite Laminat
Plant and Machinery cost:
115.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
452.00Lakhs
Add To Inquiry Basket
Manufacturing Business Plans
Manufacturing Business Plans

Manufacturing Business Plans of HDPE and PP Bags, Disposable... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plans for Production
Business Plans for Production

Business Plans for Production of Disposable Nitrile Examinat... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Cellulose (Cellulosic) Fibers
Production of Cellulose (Cellulosic) Fibers

Production of Cellulose (Cellulosic) Fibers. Growing Industry to Start a Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Investment Opportunities in DCDA (Dicyandiamide)
Investment Opportunities in DCDA (Dicyandiamide)

Dicyandiamide is a strongly alkaline and water-soluble white crystalline compound with the scientific name of cyan guanidine. The chemical is the d... Read More

Capacity :
Dicyandiamide (DCDA): 10 MT / Day
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
373.00Lakhs
Add To Inquiry Basket
How to Start Disposable Plastic Syringes (General Medical Devices) Manufacturing Business
How to Start Disposable Plastic Syringes (General Medical Devices) Manufacturing Business

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to their availability in steriliz... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size: 2,000 Boxes/ Day (Each Box = 100 Pcs.) Disposable Plastic Syr
Plant and Machinery cost:
1100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2006.00Lakhs
Add To Inquiry Basket
Manufacturing of Humic Acid
Manufacturing of Humic Acid

 

Humic acid is a principal component of Humic subst... Read More

Capacity :
Humic Acid: 20 MT / Day
Plant and Machinery cost:
169.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
726.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles Manufacturing Business
Disposable Plastic Syringes with Needles Manufacturing Business

Disposable Syringes are made of plastic material and are used in the field of medical and veterinary science. Due to t... Read More

Capacity :
Disposable Plastic Syringes with Needle 1 ml Size) : 18,000 Nos / Day Disposable Plastic Syringes
Plant and Machinery cost:
108.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
498.00Lakhs
Add To Inquiry Basket
Synthetic Camphor (Kapoor-Kapur) Powder Business Plan
Synthetic Camphor (Kapoor-Kapur) Powder Business Plan

Camphor is a waxy, flammable, white or transparent solid with a strong aroma. It is a torpedoed with the chemical form... Read More

Capacity :
Synthetic Camphor Powder : 8 MT / Day
Plant and Machinery cost:
315.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1152.00Lakhs
Add To Inquiry Basket
Manufacturing Business Plan-Dehydrated Onion
Manufacturing Business Plan-Dehydrated Onion

Onion is one of the most important commercial vegetable crops grown in India. Both immature and mature bulbs are used ... Read More

Capacity :
Dehydrated Onion Sliced/Chopped: 50 MT / Day Cattle Feed as By Product: 35 MT / Day
Plant and Machinery cost:
2976.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
5116.00Lakhs
Add To Inquiry Basket
Production of Biodegradable Tableware from Corn Starch
Production of Biodegradable Tableware from Corn Starch

Production of Biodegradable Tableware from Corn Star... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Rice Husk Based Biodegradable Cutlery
Production of Rice Husk Based Biodegradable Cutlery

Production of Rice Husk Based Biodegradable Cutlery. Highly... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Refined Oil (Cotton Seed, Ground Nut & Sunflower Oil)
Production of Refined Oil (Cotton Seed, Ground Nut & Sunflower Oil)

Production of Refined Oil (Cotton Seed, Ground Nut & Sunflower Oil). Awesome Startup... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
30 Bedded Hospital Business Plan
30 Bedded Hospital Business Plan

A hospital is supposed to treat patients suffering from various ailments. Doctors with their dedicated spirit serve the nation at large by providin... Read More

Capacity :
Special Ward Patients : 2 Patients / Day General Ward Patients: 16 Patients / Day Double Bedded Pati
Plant and Machinery cost:
347.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
604.00Lakhs
Add To Inquiry Basket
Construction Opportunities in Geotextiles for Roadways
Construction Opportunities in Geotextiles for Roadways

Geotextiles were used in roadway construction to stabilize roadways and their edges. These early geotextiles were made from natural fibres, fabrics... Read More

Capacity :
Geotextiles for Road & Construction: 2,934 Kgs / Day
Plant and Machinery cost:
326.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
665.00Lakhs
Add To Inquiry Basket
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured

Nitrile gloves are a kind of disposable gloves made up of rubber, this suggests there's no risk of latex allergies. Th... Read More

Capacity :
Disposable Nitrile Gloves (Powder Free): 500,000 Pcs. / Day
Plant and Machinery cost:
1321.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2890.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)

Active pharmaceutical ingredients are the active substances that are utilized in the manufacture of a drug and have a ... Read More

Capacity :
Azithromycin: 500 Kgs / Day Cefixime: 500 Kgs / Day Telmisartan: 50 Kgs / Day Diclofenac Sodium: 500
Plant and Machinery cost:
155.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
729.00Lakhs
Add To Inquiry Basket
Castor Oil from Castor Seeds Manufacturing Business
Castor Oil from Castor Seeds Manufacturing Business

The castor oil plant, Ricin us common is, may be a species of flowering plant within the spurge family, Euphorbiaceous... Read More

Capacity :
Castor Oil: 5 MT / Day Castor De-Oiled Cake: 7.2 MT / Day
Plant and Machinery cost:
106.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
374.00Lakhs
Add To Inquiry Basket
Surgical & N95 Mask Manufacturing Business Plan
Surgical & N95 Mask Manufacturing Business Plan

A surgical mask, also referred to as a procedure mask, medical mask or just as a face mask, is meant to be worn by health professionals during surg... Read More

Capacity :
Surgical Face Masks (each Pkts = 25 Pcs.): 576 Pkts / Day N95 Face Masks (each Pkts = 5 Pcs.): 2,880
Plant and Machinery cost:
359.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
717.00Lakhs
Add To Inquiry Basket
Earthmover JCB Bucket Pin Manufacturing and JCB Tooth Nuts, Bolt and Pin Bush
Earthmover JCB Bucket Pin Manufacturing and JCB Tooth Nuts, Bolt and Pin Bush

JCB range of Excavators is the best-in-class, which includes a wide array of large, mid & mini Excavators in the r... Read More

Capacity :
JCB Bucket Pin 42 mm Diameter : 1,666.7 Kgs / Day JCB Bucket Pin Bush : 1,666.7 Kgs / Day JCB Bucke
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
418.00Lakhs
Add To Inquiry Basket
Urea Fertilizer- Start Business in Fertilizer Industry
Urea Fertilizer- Start Business in Fertilizer Industry

Fertilizers provide three primary nutrients: Nitrogen (N), Phosphorus (P) and Potassium (K). Nitrogen supports vegetat... Read More

Capacity :
Urea Fertilizer: 972.2 MT / Day
Plant and Machinery cost:
4320.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
15110.00Lakhs
Add To Inquiry Basket
Fresh Dips
Fresh Dips

Fresh DIP is a creamy liquid that is served with food or used to prepare foods. Sauces add flavor and moisture to food... Read More

Capacity :
Fresh Dips 50 gms Size Pkts: 1,500,000 Pkts per annum Fresh Dips 20 gms Size Pkts: 3,750,000 Pkts
Plant and Machinery cost:
30.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
213.00Lakhs
Add To Inquiry Basket
Electric PCC Poles
Electric PCC Poles

Pre-Stressed Cement Concrete Poles (PCC Poles) are highly durable and strong. PCC Poles are fabricated from excellent ... Read More

Capacity :
Electric Pre-stressed Concrete Cement Poles: 24,000 Nos. per annum
Plant and Machinery cost:
284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
487.00Lakhs
Add To Inquiry Basket
Citric Acid Monohydrate
Citric Acid Monohydrate

Citric acid monohydrate occurs as colourless crystals or as white, crystalline powder with a strongly acidic taste. It... Read More

Capacity :
3,000 MT per Annum
Plant and Machinery cost:
1204.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2166.00Lakhs
Add To Inquiry Basket
Helmet Manufacturing
Helmet Manufacturing

A motorcycle helmet is a type of helmet (protective headgear) used by motorcycle riders. The primary goal of a motorcy... Read More

Capacity :
1,200 Nos. per day
Plant and Machinery cost:
246.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
602.00Lakhs
Add To Inquiry Basket
Bamboo Toothbrush
Bamboo Toothbrush

The toothbrush is an oral hygiene instrument used to clean the teeth, gums, and tongue. It consists of a head of tightly clustered bristle, atop of... Read More

Capacity :
Bamboo Toothbrush (4 Pcs. per Pack): 2,280 Packs per day Bamboo Toothbrush (1 Pc. per Pack): 9,120 P
Plant and Machinery cost:
80.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
695.00Lakhs
Add To Inquiry Basket
Fruits & Vegetables Powder Manufacturing Business
Fruits & Vegetables Powder Manufacturing Business

Fruits & Vegetables Powder Manufacturing Business. Production of Tomato, Onion, M... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Optical Fiber Cable Production Industry
Optical Fiber Cable Production Industry

Optical Fiber Cable Production Industry. Fiber-Optic Cable Manufacturing Industry.

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Mahua Oil and Country Liquor production business
Mahua Oil and Country Liquor production business

Mahua Oil and Country Liquor production business. Profitable business ideas in Alcoholic Beverage Industry

<...
Read More
Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Biodegradable plastic Products. Bioplastic Products Manufacturing Business
Production of Biodegradable plastic Products. Bioplastic Products Manufacturing Business

Production of Biodegradable plastic Products. Bioplastic Products Manufacturing Business.  Biodegrad... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Fresh water fish processing. Business Opportunities in fish processing Industry.
Fresh water fish processing. Business Opportunities in fish processing Industry.

Fresh water fish processing. Business Opportunities in fish processing Industry. Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
List of Business Ideas to Start Your Own Industry with 1.50 - 2 Crore (Plant and Machinery Cost)
List of Business Ideas to Start Your Own Industry with 1.50 - 2 Crore (Plant and Machinery Cost)

List of Business Ideas to Start Your Own Industry with 1.50 - 2 Crore (Plant and Mach... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Most Successful Small Business Ideas with Investment of 1.50 - 2 Crores
Most Successful Small Business Ideas with Investment of 1.50 - 2 Crores

Most Successful Small Business Ideas Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Sodium Chlorite Liquid from Powder (31 Percent Liquid NaClO2)
Manufacturing of Sodium Chlorite Liquid from Powder (31 Percent Liquid NaClO2)

Sodium chlorite (NaClO2) is a chemical compound used in the manufacturing of paper and as a disinfect... Read More

Capacity :
Sodium Chlorite Liquid: 1.7 MT / Day
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
120.00Lakhs
Add To Inquiry Basket
Manufacturing of Banana Wafers (Deep Fried Snack Food)
Manufacturing of Banana Wafers (Deep Fried Snack Food)

Fried banana wafers are a deep fried snack food prepared from green fresh mature bananas of the cookin... Read More

Capacity :
Banana Wafers (40 gms size): 10,700 Packets / Day Banana Wafers (20 gms size): 21,300 Packets / Day
Plant and Machinery cost:
37.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
393.00Lakhs
Add To Inquiry Basket
Fruit Wine (Alcoholic Beverage) Manufacturing Plant
Fruit Wine (Alcoholic Beverage) Manufacturing Plant

Fruit wines are fermented alcoholic beverages made up of a variety of base ingredients (other tha... Read More

Capacity :
Fruit Wine (750 ml size Bollte): 2,666.7 Bottles / Day
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
873.00Lakhs
Add To Inquiry Basket
Production of Needles for Sewing and Embroidery Machine
Production of Needles for Sewing and Embroidery Machine

A sewing needle, used for hand-sewing, may be a long slender tool with a pointed tip at one end and a hole (... Read More

Capacity :
Sewing Needles (30 g each) per Pack 50 Pcs.: 6,400 Packs / Day Embroidery Needles (30 g each) per P
Plant and Machinery cost:
256.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
939.00Lakhs
Add To Inquiry Basket
Manufacturing of Pasta and Macaroni
Manufacturing of Pasta and Macaroni

Pasta may be a food that's loved by people of all age bracket. It not just ea... Read More

Capacity :
Pasta (1 Kg Pack): 13,000 Packs / Day Macaroni (1 Kg Pack) : 13,000 Packs / Day
Plant and Machinery cost:
863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Aluminium Ingots (Aluminium Alloy Ingots) from Aluminium Scrap Manufacturing
Aluminium Ingots (Aluminium Alloy Ingots) from Aluminium Scrap Manufacturing

Ingots are very large casting products, greater in size and shape than blooms, billets and sla... Read More

Capacity :
Aluminium Alloy Ingots: 24 MT / Day Aluminium Scrap : 0.40 MT / Day
Plant and Machinery cost:
186.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
703.00Lakhs
Add To Inquiry Basket
Manufacturing of CPVC (Chlorinated Polyvinyl Chloride)
Manufacturing of CPVC (Chlorinated Polyvinyl Chloride)

 

CPVC could be a high-temperature plastic pressure piping system introduced for ... Read More

Capacity :
Chlorinated Polyvinyl Chloride: 80 MT/ Day
Plant and Machinery cost:
588.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
2283.00Lakhs
Add To Inquiry Basket
Plant‐Based Meat Alternatives -Meat Analogue, Vegan Meat & Mock Meat Manufacturing from Soyabean and Wheat Gluten
Plant‐Based Meat Alternatives -Meat Analogue, Vegan Meat & Mock Meat Manufacturing from Soyabean and Wheat Gluten

A meat analogue, also referred to as a meat alternative or substitute, or as mock, imitation, vegetarian, or vegan mea... Read More

Capacity :
Meat Analogue (200 gms each Pack): 1000 Packs / Day Vegan Meat (200 gms each Pack): 1000 Packs / Day
Plant and Machinery cost:
17.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
138.00Lakhs
Add To Inquiry Basket
Beer Production from Rice with Packaging in Can & Bottles
Beer Production from Rice with Packaging in Can & Bottles

Beer is distributed in bottles and cans and is additionally commonly available on draught, particularly in pubs and bars. The brewing industry may ... Read More

Capacity :
Rice Beer (650 ml Bottle):12,924 No’s/Day Rice Beer (500 ml Can): 16,800 No’s/Day
Plant and Machinery cost:
2631.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
4596.00Lakhs
Add To Inquiry Basket
Bleaching Powder
Bleaching Powder
Bleaching powder is calcium hypochlorite ( Ca(OCl)2 ). Bleaching powder is a white - yellowish powder which very well dissolves in water. It is a one ... Read More
Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Hand Sanitizer
Manufacturing of Hand Sanitizer

Manufacturing of Hand Sanitizer. Emerging Business Investment Opportunities in Produc... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Herbal Ayurvedic Hand Sanitizer
Production of Herbal Ayurvedic Hand Sanitizer

Production of Herbal Ayurvedic Hand Sanitizer. Startup Business Investment in Disinfectant Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Activated Charcoal from B... Activated Charcoal Powder : 1 MT/day 28.00 445.00
Adhesive (Fevicol Type) 8 MT/day 28.00 265.00
Ringers Lactate Solution 0 0.00 0.00
Investment Casting (Lost-... 0 0.00 0.00
Dough Moulded Compound 0 0.00 0.00
Electric Geyser 0 0.00 0.00
Hydrochloric Acid (For To... 0 0.00 0.00
Poplar Plantation 0 0.00 0.00
Magnesium Powder (Light) 0 0.00 0.00
Cricket Ball and Bat Manu... 0 0.00 0.00
Softy Ice Cream 0 0.00 0.00
Cold Rolled Pressed Steel... 00 0.00 0.00
Plastic Toys 0 0.00 0.00
E-Waste Recycling Plant Plastic Granules: 4, 00,000 Kgs per annum Glass Scrap:3, 00,000 Kgs per annum Copper Scrap: 2, 50,0 25.00 829.00
Mango Powder (Amchur) 0 0.00 0.00
Pentaerythritol 0 0.00 0.00
Galvanising of Zinc (By E... 0 0.00 0.00
Rubberised Coir Mattresse... 0 0.00 0.00
Silver Coated Sugar Balls 0 0.00 0.00
Flexographic Printing Ind... 0 0.00 0.00
HDPE Jumbo Bags Manufactu... 0 0.00 0.00
Detergent Cake and Deterg... 0 0.00 0.00
Biodegradable Plastic Bag... Biodegradable Plastic Bags (Per Bag 25 gms Size) : 360 MT/Annum 25.00 606.00
Lead Production (Litharge... Litharge : 960 MT/Annum Refined Lead : 1800 MT/Annum Red Lead : 440 MT/Annum Grey Lead : 525 MT/ 31.00 361.00
Fatty Alcohol Fatty Alcohol : 40 MT/Day Lauryl Alcohol (bye product) : 240 MT/Day Myrystyl Alcohol (bye prod 34.00 4271.00
Fatty Alcohol Manufacturi... 0 0.00 0.00
HDPE Twine & Rope 0 0.00 0.00
Heat & UV Stabilizers for... 0 0.00 0.00
Shaving Cream 0 0.00 0.00
Ferric Oxide 0 0.00 0.00
12345678910...

Showing 241 - 300 of 3082 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR